[{"data":1,"prerenderedAt":14},["ShallowReactive",2],{"artikel-en-berita-spacex-74-bilion-superkomputer-texas-arizona-12-november-2026":3},{"slug":4,"lang":5,"title":6,"description":7,"date":8,"updated":9,"topic":10,"product":9,"cover":11,"readMin":12,"html":13},"berita-spacex-74-bilion-superkomputer-texas-arizona-12-november-2026","en","SpaceX commits more than $74 billion to AI supercomputers in Texas and Arizona","SpaceX announced two new supercomputing campuses, but the Arizona project still needs county approval and faces local opposition.","2026-11-13",null,"berita","\u002Fimages\u002Fartikel\u002Fberita-spacex-74-bilion-superkomputer-texas-arizona-12-november-2026.webp",4,"\u003Cp>SpaceX, Elon Musk&#39;s rocket and AI company, announced on November 12, 2026 that it will invest more than $74 billion to build two supercomputing campuses in the United States. One at Starbase, Texas, and one in Cochise County, Arizona. The news confirms the rocket company is now also an AI infrastructure company.\u003C\u002Fp>\n\u003Ch2>1. How big each campus is\u003C\u002Fh2>\n\u003Cp>According to the company statement reported by UPI and by Dow Jones via Morningstar, the Starbase campus in the Rio Grande Valley, Texas, is expected to cost around $24 billion. The campus in Cochise County, Arizona is estimated at roughly $50 billion.\u003C\u002Fp>\n\u003Cp>The Texas campus will sit on about 444 acres of company-owned land near the Port of Brownsville. It will generate its own electricity rather than drawing from the public grid. The Arizona campus will cover about 747 acres near Willcox Playa, roughly 80 miles east of Tucson, according to Construction Review, cited by UPI.\u003C\u002Fp>\n\u003Ch2>2. How many jobs\u003C\u002Fh2>\n\u003Cp>The company says the Texas project has already generated more than 3,000 construction jobs and will support more than 500 permanent jobs once operational. The Arizona project is expected to bring about 5,500 construction jobs and 1,000 permanent jobs.\u003C\u002Fp>\n\u003Cp>The Texas project also includes a $220 million commitment to water and wastewater infrastructure serving Brownsville and Cameron County, expected to add about 20 million gallons of daily water capacity.\u003C\u002Fp>\n\u003Ch2>3. AI is now more than half of revenue\u003C\u002Fh2>\n\u003Cp>SpaceX&#39;s AI segment generated more than half of company revenue in the third quarter, according to Reuters. SpaceX went public in June 2026 in the largest IPO in history.\u003C\u002Fp>\n\u003Cp>According to Yahoo Finance, SpaceX had 1.7 gigawatts of installed compute at the end of September and is targeting 2.5 to 3 gigawatts by the end of 2026. Its main cluster, Colossus, on the Tennessee-Mississippi border, is partly leased to Anthropic under a multi-year deal worth about $1.25 billion per month through May 2029. Google is also a customer.\u003C\u002Fp>\n\u003Ch2>4. Energy and the environment\u003C\u002Fh2>\n\u003Cp>SpaceX says the Arizona campus will use dry cooling with no planned industrial groundwater use, and that it is working with local electric cooperatives. The company claims the project could cut electricity bills for cooperative members by up to 20 percent.\u003C\u002Fp>\n\u003Cp>The project also includes a proposed $3.6 billion investment in electrical infrastructure and a 24-gigawatt-hour battery storage system, according to UPI.\u003C\u002Fp>\n\u003Ch2>5. Local opposition and approvals\u003C\u002Fh2>\n\u003Cp>The Arizona project still needs approval from Cochise County. A petition with about 2,400 signatures has asked officials to deny the permit, and a county public hearing is set for December.\u003C\u002Fp>\n\u003Cp>In Texas, the Starbase City Commission will consider a property tax abatement for the project on December 9, according to Reuters. Residents in both states have raised concerns about the electricity and water demands of large data centers.\u003C\u002Fp>\n\u003Ch2>6. What all this compute is for\u003C\u002Fh2>\n\u003Cp>According to the company statement, the new facilities will train advanced AI systems for medical research, emergency response, manufacturing and national security. Yahoo Finance reports the sites will also support tests of space-based computing through the Starmind orbital constellation, with an FCC filing for up to 1 million satellites and a first launch expected in 2027.\u003C\u002Fp>\n\u003Ch2>What it means for you\u003C\u002Fh2>\n\u003Cp>If you follow the AI industry, this news confirms that the compute race is no longer limited to OpenAI, Google or Microsoft. A rocket company is now a major player.\u003C\u002Fp>\n\u003Col>\n\u003Cli>\u003Cstrong>AI compute costs keep climbing.\u003C\u002Fstrong> A $74 billion outlay means demand for chips, electricity and land stays high, and those costs eventually reach AI subscription prices.\u003C\u002Fli>\n\u003Cli>\u003Cstrong>The effects reach beyond the US.\u003C\u002Fstrong> Anthropic and Google lease Colossus capacity, so part of this new buildout exists to serve customers like them.\u003C\u002Fli>\n\u003Cli>\u003Cstrong>Do not assume every project is a done deal.\u003C\u002Fstrong> The Arizona campus still needs a county hearing in December, and a 2,400-signature petition shows real resistance.\u003C\u002Fli>\n\u003Cli>\u003Cstrong>Watch the energy debate.\u003C\u002Fstrong> The water and electricity arguments in Texas and Arizona are a template for the same debates anywhere, including Malaysia as it courts data center investment.\u003C\u002Fli>\n\u003C\u002Fol>\n\u003Ch2>Sources\u003C\u002Fh2>\n\u003Cul>\n\u003Cli>\u003Ca href=\"https:\u002F\u002Fwww.upi.com\u002FTop_News\u002FUS\u002F2026\u002F11\u002F12\u002Fspacex-musk-AI-supercomputing-texas-arizona\u002F8361794521839\u002F\" target=\"_blank\" rel=\"noopener\">SpaceX to build $74B AI supercomputing facilities in Texas, Arizona\u003C\u002Fa> (UPI)\u003C\u002Fli>\n\u003Cli>\u003Ca href=\"https:\u002F\u002Fwww.morningstar.com\u002Fnews\u002Fdow-jones\u002F2026111211784\u002Fspacex-plans-more-than-74-billion-in-texas-arizona-data-center-investments\" target=\"_blank\" rel=\"noopener\">SpaceX Plans More Than $74 Billion in Texas, Arizona Data-Center Investments\u003C\u002Fa> (Dow Jones via Morningstar)\u003C\u002Fli>\n\u003Cli>\u003Ca href=\"https:\u002F\u002Ffinance.yahoo.com\u002Ftechnology\u002Fai\u002Farticles\u002Fspacex-commits-74b-ai-campuses-175531621.html\" target=\"_blank\" rel=\"noopener\">SpaceX Commits $74B To New AI Campuses\u003C\u002Fa> (Yahoo Finance)\u003C\u002Fli>\n\u003C\u002Ful>\n",1795068892780]