[{"data":1,"prerenderedAt":14},["ShallowReactive",2],{"artikel-en-berita-google-labur-15-bilion-malaysia-4-november-2026":3},{"slug":4,"lang":5,"title":6,"description":7,"date":8,"updated":9,"topic":10,"product":9,"cover":11,"readMin":12,"html":13},"berita-google-labur-15-bilion-malaysia-4-november-2026","en","Google Pledges Another US$15 Billion in Malaysia for Data Centers and AI","Google announced a new US$15 billion investment running 2027 to 2028, with new data center campuses in Selangor and Negeri Sembilan plus AI training for 800,000 Malaysians.","2026-11-08",null,"berita","\u002Fimages\u002Fartikel\u002Fberita-google-labur-15-bilion-malaysia-4-november-2026.webp",4,"\u003Cp>Google announced an additional US$15 billion (about RM61 billion) investment in Malaysia on November 4, 2026. The investment spans just two years, 2027 to 2028, and focuses on data centers, clean energy and AI skills training. Ruth Porat, President and Chief Investment Officer of Alphabet and Google, made the announcement at Universiti Malaya in the presence of Prime Minister Anwar Ibrahim.\u003C\u002Fp>\n\u003Ch2>1. New campuses in Selangor and Negeri Sembilan\u003C\u002Fh2>\n\u003Cp>The investment covers an expansion of the existing data center campus at Elmina Business Park in Selangor, plus new planned campuses in Selangor and Negeri Sembilan. Computing capacity in Selangor will support Google&#39;s upcoming Malaysia Cloud region.\u003C\u002Fp>\n\u003Cp>Notably, Google&#39;s first campus at Elmina is now fully operational, two years after the initial US$2 billion investment announced in May 2024. Porat said the site runs 24 hours a day, every day.\u003C\u002Fp>\n\u003Cfigure>\n  \u003Cimg src=\"\u002Fimages\u002Fartikel\u002Fberita-google-labur-15-bilion-malaysia-4-november-2026\u002Fporat-anwar-pelancaran.webp\" alt=\"Ruth Porat, Anwar Ibrahim and Johari Abdul Ghani at Google's Malaysia investment launch event\" loading=\"lazy\" decoding=\"async\" width=\"950\" height=\"632\">\n  \u003Cfigcaption>Ruth Porat, Anwar Ibrahim and Johari Abdul Ghani at the Mantap Malaysia Bersama AI event at Universiti Malaya. Photo: Google Blog.\u003C\u002Ffigcaption>\n\u003C\u002Ffigure>\u003Ch2>2. How many jobs, really\u003C\u002Fh2>\n\u003Cp>The jobs numbers deserve a careful read. During the construction phase in 2027 and 2028, Google expects its campuses to contribute an average of US$1.1 billion a year to Malaysia&#39;s GDP and support more than 37,000 local jobs annually, including roughly 6,000 in construction.\u003C\u002Fp>\n\u003Cp>Once fully operational, however, the facilities are projected to sustain more than 9,000 jobs a year, with wages averaging 45 percent above the national median. That 9,000 figure includes supplier roles and wider-economy jobs, not just on-site staff.\u003C\u002Fp>\n\u003Cp>Investment, Trade and Industry Minister Johari Abdul Ghani raised this question publicly on November 5. He said Malaysia must not stop at hosting infrastructure and needs to create its own digital value. For context, data center and cloud projects made up RM95.8 billion, nearly 44 percent, of the RM218.5 billion in investments approved in the first half of the year, and Malaysia has approved 117 data centers so far.\u003C\u002Fp>\n\u003Ch2>3. AI training for 800,000 Malaysians\u003C\u002Fh2>\n\u003Cp>Google also announced four programs to train about 800,000 Malaysians between 2027 and 2031:\u003C\u002Fp>\n\u003Cul>\n\u003Cli>Experience AI Malaysia, with the Ministry of Education and the Raspberry Pi Foundation, for teachers of students aged 11 to 14.\u003C\u002Fli>\n\u003Cli>Jelajah AI MSME, with Pepper Labs, helping microentrepreneurs build online business profiles and digital storefronts.\u003C\u002Fli>\n\u003Cli>AKAD Rakyat, with Arus Academy, for officers at 19 local councils in Selangor and Negeri Sembilan.\u003C\u002Fli>\n\u003Cli>Data Center Institutes at selected polytechnics, with a 10-week curriculum starting in 2027 for aspiring data center workers.\u003C\u002Fli>\n\u003C\u002Ful>\n\u003Ch2>4. Clean energy and water\u003C\u002Fh2>\n\u003Cp>Google pledged to add more than 1 gigawatt of clean energy capacity to the national grid, working with Tenaga Nasional Berhad under the Corporate Renewable Energy Supply Scheme. Anwar stressed that Google is not competing with households for electricity and pays the full cost of its own power without public subsidies.\u003C\u002Fp>\n\u003Cp>The company says its custom-designed equipment lets its campuses run at a power usage effectiveness (PUE) of 1.12 to 1.14 in tropical climates, against an industry average of 1.54. A PUE closer to 1.0 means less electricity wasted on cooling and other overheads.\u003C\u002Fp>\n\u003Cp>On water, Google is developing an off-river storage reservoir and water treatment plant in Negeri Sembilan designed to supply 65 million litres of treated water a day. Ownership of the facility will be handed to the state government on completion.\u003C\u002Fp>\n\u003Ch2>What it means for you\u003C\u002Fh2>\n\u003Cp>This investment cements Malaysia&#39;s position as Southeast Asia&#39;s data center hub, but the real value for ordinary people depends on how much of the training and jobs actually reach locals. If you work in tech or run a small business, there are openings worth acting on.\u003C\u002Fp>\n\u003Col>\n\u003Cli>\u003Cstrong>AI skills are getting easier to access.\u003C\u002Fstrong> Google&#39;s four training programs, aimed at teachers, microentrepreneurs and TVET jobseekers, start in communities across Selangor and Negeri Sembilan. Watch for openings if you fit the target groups.\u003C\u002Fli>\n\u003Cli>\u003Cstrong>Data center technical roles are hiring now.\u003C\u002Fstrong> Google is already recruiting local technical and facilities management talent, and the Data Center Institutes at polytechnics start in 2027.\u003C\u002Fli>\n\u003Cli>\u003Cstrong>SMEs can tap the new infrastructure.\u003C\u002Fstrong> The Malaysia Cloud region will give local enterprises high-performance cloud access without leaving the country.\u003C\u002Fli>\n\u003Cli>\u003Cstrong>Keep an eye on electricity and water.\u003C\u002Fstrong> Rapid data center growth adds pressure on state power and water supplies, something the government itself is monitoring.\u003C\u002Fli>\n\u003C\u002Fol>\n\u003Ch2>Sources\u003C\u002Fh2>\n\u003Cul>\n\u003Cli>\u003Ca href=\"https:\u002F\u002Fblog.google\u002Fintl\u002Fen-my\u002Fcompany-news\u002Finside-google\u002Fgoogle-investment-malaysia-digital-infrastructure-november-2026\u002F\" target=\"_blank\" rel=\"noopener\">Google Announces Digital Infrastructure Expansion with US$15 Billion Malaysia Investment\u003C\u002Fa> (Google Blog)\u003C\u002Fli>\n\u003Cli>\u003Ca href=\"https:\u002F\u002Fmalaysia.news.yahoo.com\u002Fgoogle-commits-additional-us-15b-101848088.html\" target=\"_blank\" rel=\"noopener\">Google commits additional US$15b to Malaysia data centre expansion\u003C\u002Fa> (Malay Mail)\u003C\u002Fli>\n\u003Cli>\u003Ca href=\"https:\u002F\u002Fwww.nst.com.my\u002Famp\u002Fnews\u002Fnation\u002F2026\u002F11\u002F1571055\u002Fjohari-malaysia-must-be-more-host-tech-giants\" target=\"_blank\" rel=\"noopener\">Johari: Malaysia must be more than a host for tech giants\u003C\u002Fa> (New Straits Times)\u003C\u002Fli>\n\u003Cli>\u003Ca href=\"https:\u002F\u002Fwww.crnasia.com\u002Fnews\u002F2026\u002Fdata-center\u002Fgoogle-to-invest-us-15-billion-in-malaysia-as-first-data-cen\" target=\"_blank\" rel=\"noopener\">Google to invest US$15 billion in Malaysia as first data center campus goes live\u003C\u002Fa> (CRN Asia)\u003C\u002Fli>\n\u003C\u002Ful>\n",1795068893024]